BUILDING TECHNOLOGY
BUILDING TECHNOLOGY
Mechanical and
Electrical Systems
Second Edition
BENJAMIN STEIN
Consulting Engineer
JOHN WILEY & SONS, INC. New York Chichester Brisbane Toronto Singapore
Weinheim
DISCLAIMER
The information in this book has been derived and ex-
tracted from a multitude of sources, including building
codes, fire codes, industry codes and standards, manufac-
turer's literature, engineering reference works and per-
sonal professional experience. It is presented in good
faith, but, although the author and the publisher have
made every reasonable effort to make the information
presented accurate and authoritative, they do not war-
rant, and assume no liability for, its accuracy or com-
pleteness or its fitness for any specific purpose. It is pri-
marily intended as a learning and teaching aid and not
as a source of information for the actual final design of
building systems. It is the responsibility of users to apply
their professional knowledge in the use of the information
presented in this book and to consult original sources for
current detailed information as needed, in actual design
situations.-Benjamin Stein P.E.
This text is printed on acid-free paper.
Copyright © 1997 by John Wiley & Sons, Inc.
All rights reserved. Published simultaneously in Canada.
Reproduction or translation of any part of this work be-
yond that permitted by Section 107 or 108 of the 1976
United States Copyright Act without the permission of
the copyright owner is unlawful. Requests for permission
or further information should be addressed to the Permis-
sions Department, John Wiley & Sons, Inc., 605 Third Av-
enue, New York, NY 10158-0012.
This publication is designed to provide accurate and
authoritative information in regard to the subject
matter covered. It is sold with the understanding that
the publisher is not engaged in rendering legal, accounting,
or other professional services. If legal advice or other
expert assistance is required, the services of a competent
professional person should be sought.
Library of Congress Cataloging in Publication Data:
Stein, Benjamin.
Building technology : mechanical & electrical systems / Benjamin
Stein.-2nd ed.
p. cm.
Rev. ed. of: Building technology / William J. McGuinness, Benjamin
Stein, c1977.
Includes bibliographical references and index.
ISBN 0-471-59319-2 (cloth : alk. paper)
1. Buildings-Mechanical equipment. 2. Buildings-Electric
equipment. 3. Buildings-Environmental engineering.
I. McGuinness, William J. Building technology. II. Title.
TH6010.M24 1996
696-dc20 96-6186
Printed in the United States of America
10 9 8 7
Preface
This book was written to provide the knowledge
required for the job position of technologist in the
building industry. This job position also carries the
title of draftsman, junior designer, field service
engineer, inspector and technician, depending on
the company, the project and the type of work in-
volved.
The building process generally can be divided
into three phases: the planning phase, the con-
struction phase, and the maintenance and field
service phase after beneficial occupancy of the fa-
cility. The technologist will find opportunities to
apply his or her knowledge in all three phases.
The planning phase of a building project involves
the architect and the engineering consultants. The
function of the architect is programming and space
planning. The architect confers with the various
project engineers with respect to mechanical and
electrical systems in order to determine the type of
systems that will best suit a facility. At this stage
of planning, the technologist generally is not in-
volved. Once the overall system planning is com-
pleted, the project mechanical (HVAC), electrical
and plumbing engineers begin detailed design. It is
at this stage that the technologist is called upon.
The usual arrangement for a project at the design
stage, in an engineering office, involves the follow-
ing technical positions:
Project engineer.
Design engineers (designers).
Technologists (junior designers, draftsmen).
In addition, specialists such as lighting designers,
computer personnel and energy specialists may be
involved, depending on the type and size of the job.
The project engineer coordinates with the architect
and the various design specialties. The design en-
gineer(s) perform the actual system design and cal-
culations, with the assistance of one or more tech-
nologists. The technologist is responsible for pro-
v
vi
ducing the working drawings; that is, he or she is
primarily concerned with the "nuts and bolts" of
the job. The working drawings are contract docu-
ments that, along with the job specifications, tell
the contractor, in detail, what the job requirements
are. Their preparation involves a thorough knowl-
edge of basic principles, design procedures, equip-
ment and hardware, installation procedures and
the techniques of drawing preparation
Working drawings were, until recently, generally
produced by a draftsman or junior designer who
sat at a drafting table and physically drew them,
usually with pencil on paper but also sometimes
with ink on vellum or cloth. The advent of comput-
ers, CAD (computer aided design) programs and
plotters has, in large measure, replaced hand draw-
ing, although manual preparation of working
drawings is still found occasionally in design of-
fices and frequently in field construction offices.
For the most part, however, the job title of drafts-
man is no longer applicable; technologist or junior
designer is more appropriate. Although this person
may now "draw" at a computer console, the knowl-
edge required for the job is the same as previously
required.
Once the planning is complete and contracts let,
the construction phase of building begins. At this
stage, technologists in the engineer's office handle
design changes (of which there are always some),
shop drawings (manufacturer's detailed equip-
ment drawings), some material inspection and a
considerable portion of the field construction in-
spection work, including solving coordination and
space allocation problems. Technologists in the
contractor's office prepare large-scale, detailed, co-
ordinated installation drawings, for the use of the
trade construction personnel. Much of this work is
still hand drawn. They also handle equipment shop
drawings and sometimes are involved with mate-
rial acquisition. Technologists on the contractor's
staff may work in the contractor's field office on
large jobs, doing many types of field work and
coordination work with equipment suppliers.
Technologists working for equipment manufac-
turers prepare detailed equipment drawings and
provide the necessary coordination with the engi-
neer and contractor. When construction is complete,
technologists from the engineer's and con-
tractor's offices will assist in the very extensive
job of field testing, adjusting and balancing of
mechanical and electrical systems.
After a building is turned over to the owner
for "beneficial occupancy," it becomes the owner's
responsibility to maintain the building's systems.
With today's complex M/E systems, this is not a
simple task. Often the owner hires a service com-
pany to perform this function, which, in turn, hires
field service engineers and technicians who have
a construction and/or manufacturing background.
Here again, the M/E technologist can find construc-
tive use for his or her knowledge and capabilities.
From the foregoing it should be evident that
the building industry has a continuing need for
competent mechanical and electrical technolo-
gists. It is to provide the necessary technical back-
ground for such persons that this book is intended.
Since the publication of the first edition of this
book 20 years ago, the building industry has under-
gone many changes. Design must meet the ever
more demanding requirements of energy codes,
laws delineating the needs of handicapped persons,
environmental impact standards and improved hu-
man comfort criteria. Also, modern buildings not
only must meet the complex technological needs of
its occupants but also must be designed for ex-
treme flexibility in order to meet the rapid techni-
cal changes that typify our society.
In the construction phase, new materials and
installation techniques have been developed that
are less labor-intensive yet provide better service-
ability and longer life. No field has developed more
rapidly than that of controls and automation,
which make life easier for the user but much more
complicated for the engineering staff.
All of these developments have been considered
in the preparation of this completely revised sec-
ond edition. In addition, the underlying (and un-
changing) principles upon which all technical de-
sign is based have been restated, refreshed, and
re-presented in what I trust is an interesting and
informative fashion.
Benjamin Stein
Acknowledgments
No modern book is ever the exclusive product of
one person's labor. I am deeply indebted to all
those who have given aid and advice during the
years of preparing this text. First and foremost,
however, I wish to acknowledge and thank my wife
LiIa Stein, who strongly encouraged me to prepare
this revision and who took upon herself the de-
manding task of corresponding with manufactur-
ers whose products are illustrated, plus the burden
of all phases of manuscript typing and preparation.
Without her diligent and excellent work, this revi-
sion would not have been possible.
Dr. Hamilton A. Chase provided me with some of
the source material for the HVAC and plumbing
sections of this book, plus astute comments on
their use. Mr. Shlomo Chen of Tel Aviv, Israel,
provided valuable suggestions at the outset of this
project. Mr. Arthur Fox's excellent review com-